700-800 tons of limestone crushing equipment, the stone material blasts down from the mountain, and the stone material less than 1020mm is sent to the vibrating feeder through the dump truck. The vibrating feeder sends the stone evenly to the jaw crusher to do the first stage of crushing, the stone broken from the jaw is about 150mm-300mm. Then the material is sent to the European version of the impact crusher by the vibrating feeder for the second stage of crushing, and the material is graded and screened by the circular vibrating screen. The material larger than the finished product is returned to the impact for broken and re-broken, and the finished product is conveyed to the finished product area by the belt conveyor.